ну какие известия
када заработат ?
Добавлено через 4 минуты 35 секунд
After the fire marshall inspected the H1 location, we were given the green light to bring power back to the facility. The generators have been turned on, and we are receiving power on the second floor. The generator power restoration is the first step in the full restoration of service to the data center.
From here, we will begin the process of cooling the DC floor, which could take a few hours. As soon as the power integrity is confirmed and the DC floor is ready for operation, we will be restoring power and checking server hardware on a rack-by-rack basis
чего он тут говорит ?
|